Olympic Venues and arrangements related to construction thereof | Responsible Agent |
35. | Construction of the network of press-centres, internet-centres and Call-centres at Olympic Venues including construction of automatic phone station 2500 numbers, 3 remote units for data transfer providing access to Internet and to be equipped with cellular communication terminals (including design-survey works) | investor |
36. | Development of system project for single information-telecommunication conception purposed to prepare and ensure functionality of the arrangements at the Olympic Winter Games XXII and Paralympics Winter Games XI 2014 in Sochi | Rossvyaz |
Subprogram "Construction and reconstruction of the sites for development of Sochi city as a mountain climatic resort and sites that ensure functionality thereof" | ||
Transport infrastructure | ||
37. | Construction of car roads from poselok Esto-Sadok to sport-tourism complex "Gornaya Karusel" (Oplymiiskaya mediaderevnaya) (including design-survey works), northern slope of the Aibga ridge | State Corporation “Olympstroy” |
9
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
38. | Construction of combined (car and rail) road Adler – low mountain level station at the mountain ski resort "Roza Khutor" with electrical power supply for rail road communication routes (including design-survey works) | Open Joint-stock company"Rossiiskiye zhelezniye dorogi" |
39. | Purchase of trains and special vehicles | State Corporation “Olympstroy” |
40. | Making solution for logistic system and for project purposed to form a logistic transport center in Sochi city | Mintrans of Russia |
41. | Reconstruction of short-route bypass road from motorway interchange at the area of sport complex "Stadion" to bridge across Sochi river in the district of Kransodarskoe koltso (including design-survey works) | State Corporation “Olympstroy” |
42. | Construction of bridge for cars across Sochi river, central district of Sochi city (including design-survey works) | Rosavtodor |
43. | Reconstruction of the bridge across Sochi river in the district of Kransodarskoe koltso (including design-survey works) | State Corporation “Olympstroy” |
44. | Construction of federal (car) road М-27 Dzhubga - Sochi to the boarder with Georgia by the route Adler - Veseloe (including design-survey works) | Rosavtodor |
1 0
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
45. | Construction of high road of Sochi city "Dubler Kurortnogo Prospekta " from federal road (172 km) М-27 Dzhubga - Sochi (Pskhe river) to beginning of bypass of Sochi PK (0 km) (Agura river) | Rosavtodor |
46. | Construction of motorway interchange at intersection between Kurortny propekt (avenue) and Divnogorskaya street (185 km, "Bykhta") on the (car) road М-27 Dzhubga - Sochi to the border with Georgia (by route to Tbilisi, Baku), Krasnodarsky area | Rosavtodor |
47. | Construction of motorway interchange at intersection between Kurortny propekt (avenue) and Gornostrelkovaya diviziayakm, "Stadion") on the (car) road М-27 Dzhubga - Sochi to the border with Georgia (by route to Tbilisi, Baku), Krasnodarsky area | Rosavtodor |
48. | Construction of motorway interchange at two levels, at intersection between Vinogradnoi street and Donskoi street (174 km) on the road М-27 Dzhubga - Sochi to the border with Georgia (by route to Tbilisi, Baku), Krasnodarsky area | Rosavtodor |
49. | Construction of (car) road М-27 М-27 Dzhubga - Sochi to the border with Georgia (by route to Tbilisi, Baku), at the part of bypass of the Sochi city | Rosavtodor |
50.* | Construction of motorway interchange at two levels, at intersection between Plastunskaya street and Makarenko street - low level descent ("Makarenko") | Administration of Krasnodarsky area, Rosavtodor |
1 1
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
51.* | Construction of motorway interchange at two levels, at intersection between Plastunskaya street and Makarenko street - high level descent ("Vertodrom" (site for helicopters) | Administration of Krasnodarsky area, Rosavtodor |
52.* | Construction of motorway interchange at two levels, at intersection between Transportnaya street with road branch from car road "Bypass of Sochi city” ("Thermo Power Station") | Administration of Krasnodarsky area, Rosavtodor |
53. | Construction of motorway interchange at two levels on federal (car) road М-27 Dzhubga - Sochi to the border with Georgia in the micro-district Golubiye Dali, Adlersky district, Sochi city | Rosavtodor |
54.* | Construction of motorway interchange at two levels, at intersection between Gagarina street and Donskoi street | Administration of Krasnodarsky area, Rosavtodor |
55. | Reconstruction of Sochi port with sea-side infrastructure purposed to create an international centre for sea passenger and cruise transportation | Rosmorrechflot |
56. | Formation of load area at the Sochi port including arrangement of seaside infrastructure at the mouth of Mzymta river with further modernization in yacht sport infrastructure | Rosmorrechflot |
57. | Formation of load area at the Sochi port including arrangement of seaside infrastructure at the mouth of Psou river | Rosmorrechflot |
1 2
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
58. | Reconstruction, construction of 15 sea terminals at Sochi sea port with forming seaside infrastructure purposed to recover local passenger sea routes (Imeretinka, Yuzhniye kultury, Adler, Kurgorodok, Kudepsta, Khosta, Metsesta, Kurpark, Noviye Sochi, Mamaika, Dagomys, Lo, Vardane, Lazarevskoe, Ashe) | Rosmorrechflot |
59. | Purchase of high-speed passenger ships (sea “taxi” boats) for local passenger sea routes | investor |
60. | Reconstruction of aerodrome at Sochi city airport | Rosaviatsiya |
61. | Reinforcement of rail road infrastructure by route Tuapse - Adler | Open Joint-stock company"Rossiiskiye zhelezniye dorogi" |
62. | Organization of railroad network Sochi - Adler – Sochi airport with construction of new rail road line Adler - airport | Open Joint-stock company"Rossiiskiye zhelezniye dorogi" |
63. | Organization of unloading yards to provide receipt of loads coming for construction of the Olympic Venues | Open Joint-stock company"Rossiiskiye zhelezniye dorogi" |
1 3
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
64. | Reconstruction of railroad terminals to be equipped for use by disabled persons (including design-survey works) | Open Joint-stock company"Rossiiskiye zhelezniye dorogi" |
65. | Making a solution on how to arrange transport movement and to make construction of single automation system to mange road movement (including design-survey works) | Administration of Krasnodarsky area, Administration of Sochi city |
66. | Completion of construction of airport station complex in Sochi city (including design-survey works) | Open Joint-stock Company "Mezhdunarodny aieroport Sochi" |
67. | Construction of motorway interchange "Adlerskoe koltso" at various levels (including design-survey works) | Rosavtodor |
68. | Construction of parking and parking areas (including design-survey works) | Administration of Krasnodarsky area, Administration of Sochi city, investor |
69. | Reconstruction of existing city located car roads (including design-survey works) | Administration of Krasnodarsky area, Administration of Sochi city |
70. | Construction of roads leading to places of sight-seeing, pedestrian areas, overpasses, passages and bridges (including design-survey works) | Administration of Krasnodarsky area, Administration of Sochi city |
1 4
Olympic Venues and arrangements related to construction thereof | Responsible Agent | |
71. | Repair of roads leading to places of sight-seeing, pedestrian areas, overpasses, passages and bridges (including design-survey works) | Administration of Krasnodarsky area, Administration of Sochi city |
Engineering infrastructure | ||
72. | Development of water system scheme, Krasnopolyansky poselkovy area | State Corporation “Olympstroy” |
73. | Construction of drain water treatment facilities, 12 thousand cubic meters (including design-survey works), Krasnopolyansky poselkovy area | State Corporation “Olympstroy” |
74. | Construction of main pump-automated manifold Ø mm (including design-survey works), poselok Krasnaya Polyana | State Corporation “Olympstroy” |
75. | Construction of water supply networks in the district of Imperetinskaya lowland (including design-survey works) | State Corporation “Olympstroy” |
76. | Construction of main sewage system networks Kudepsta - Adler - Imeretinskaya lowland - Psou (including design-survey works) | State Corporation “Olympstroy” |
77. | Construction of new treatment facilities in Adlersky district, 100 thousand m3 per day (including design-survey works) | State Corporation “Olympstroy” |
|