  Modernisation and upgrade of manufacture in The Open Joint-stock company Society «Lida Elektrowares Factory»

A.  Project Opportunity Description:

A1.  Project Name:

  Modernisation and upgrade of manufacture in The Open Joint-stock company Society «Lida Elektrowares Factory»

а. Short name:

  Modernisation and upgrade of manufacture

  b. Full name:

  Modernisation and upgrade of manufacture in The Open Joint-stock company Society «Lida Elektrowares Factory»

  c. Summary description:

  The purpose of the present project is upgrade of a site of manufacturing of details from plastics, upgrade of assembly manufacture and mechanical shops that will allow to expand assortment of large-sized details to fixtures of street illumination and luminescent fixtures to reduce energy consumption, to reduce labour input, to lower material inputs, to raise (increase) competitiveness of issued production.

А2. Progress Status:

  Preinvestment stage. The organization executes preliminary technical and economic calculations, the project, the business-plan is developed, the business-plan has passed the coordination in the Ministry of Economics and the Ministry of Finance. The «know-how» and the list of the capital equipment is determined. The investor is required.

А3. Organizations involved and their roles:

  1) Open Joint-stock company Society «Lida Elektrowares Factory»– the initiator of the project, the borrower: 4, Factory Str., Lida, Republic of Belarus. Ivanko Leonid Vladimirovich, director, tel.: (+375–15, fax: (+375–15; e-mail: *****@***ru; 2) Ministry of Industry: 2, building 4, Partizansky Ave., Minsk, Republic of Belarus. Pozniak Sergei Evgen'evich, tel.: (+375-, fax: (+375-

А4. Project Description:

  Introduction of the project of modernisation and upgrade of manufacture is planned to carry out in the way modernisation working: a site of manufacturing of details from plastic, tool shop.

А4a. Project cost (mln USD):

  3.6

  A5.  Background / history / overall programme / related or similar projects:

  The basic kind of activity: manufacture of products of lighting engineering – special fixtures, luminescent fixtures, fixtures of street illumination, the equipment regulating start-up, lighting devices for management of an operating mode of discharge lamps.

  A6.  Environmental impact summary:

  The emissions formed at processing of plastics, do not exceed sanitary norms and maximum permissible concentration.

  A7.  Possible obstacles/ problems/ risk assessment:

  The most essential risk influencing realization of the project – increase in the prices at raw material and materials.

  A8.  Term of realization / term of recoupment (years):

  2 / 3,3

  A9.  Project’s branch:

  Mechanical Engineering and Metal-working

B.  Capital Cost Items (additional requirements for project):

B1. Project physical components

B2. Capital cost (mln USD)

  Purchase of the equipment (Taiwan, Chinese People's Republic, Germany):

  2.2

  Expenses for formation of a pure (clean) working capital:

1.4

  Total:

  3.6

C.  Capital Resources Available from Sponsors/ Proposers:

C1.  Resources 'in kind', grants, investments, equity / ownership, etc.

C2. Amount (mln USD)

Own means:

  1.4

D.  Required Financial Assistance:

D1.  Financing gaps, type of financial assistance required:

  Crediting.

D2.  Sources of finance

D3. Type of investment

D4. Amount (mln USD)

  Foreign investment funds:

  Credit:

  2.2

D5.  Financial/ International Institution Name:

E.  Demand (users) and revenues:

E1.  Type of users/ markets, volumes, pricing, revenues, quantifiable benefits/ savings:

  The market of Russia – 13%, home market RB – 72%, the market of the countries of far abroad – 5%. The basic consumer in a home market – the enterprises of concern «Belenergo».

E2.  Revenues (Sales)

E3. Amount (mln USD)

  Income fixtures' realization:

9.9

F.  Operating and Maintenance Costs:

F1.  Cost components, strategies for cost recovery, operating organisations, subsidies, etc.:

  For realization of the project the enterprise has floor spaces, engineering networks and communications, energy sources. Construction of new buildings and constructions is not required.

F2. Cost Item

F3. Amount (mln USD)

  Raw material, materials, fuel and energy on the technological purposes:

  6.0

  Charges on the personnel:

  2.4

  Amortization:

  0.2

  Other:

  0.9

  Total:

9.5

G.  Net Income Value:

G1. Net Income Value

G2. Amount (mln USD)

Net profit:

  0.4

H.  Project information source:

H1.  This form was completed by:

  Zubrik Galina Nikolaevna, the chief of an economical department, tel.: (+375-156

H2.  Organisation (address):

  Open Joint-stock company Society «Lida Elektrowares Factory»: 4, Factory Str., Lida, Republic of Belarus.

H3.  Тel/Fax/E-mail:

  Tel.: (+375–15, fax: (+375–15; e-mail: *****@***ru

H4.  Date:

  14.03.2006

H5.  Supreme Organization:

  Ministry of Industry