Партнерка на США и Канаду по недвижимости, выплаты в крипто
- 30% recurring commission
- Выплаты в USDT
- Вывод каждую неделю
- Комиссия до 5 лет за каждого referral
Greenfield Investment offer
Investment proposal for the construction of livestock facilities for milk and meat
Location | type of area | rural |
village | Vyshcheolchedaiv | |
district | Murovani-Kurylivtsi | |
region | Vinnytsia | |
Features of area | Maximum available area (hectares) | 19,3 hа |
Development opportunities (short description) | Area for construction of complex for feeding cattle | |
Information about the owner | Approximate land price (UAH/m2) | 28,36 |
Owner(s) | Private Enterprise «Istyna», Vyshcheolchedaiv village | |
Availability of current conceptual design (Yes/No) | No | |
Zoning | Forest - steppe | |
Characteristic of the land plot | Type of soil on the plot (ha) | Grey, forest |
Difference in ground level (m) | - | |
Current use of the plot | Not use | |
Pollution of groundwater (Yes/No) | No | |
Level of groundwater (m) | 4-6 m | |
Available geological researches of the plot (Yes/No) | No | |
Risk of flooding or landslides (Yes/No) | No | |
Underground barriers (Yes/No) | No | |
Ground and air barriers (Yes/No) | No | |
Ecological barriers (Yes/No) | No | |
Buildings and premises on the plot (Yes/No) | Yes | |
Transport | Access roads to the plot (type and width of available road) | Road with hard surface 5 m wide |
The nearest road of national importance (km) | М-21: Zhytomyr – Mogyliv-Podilsky (12 km.) | |
Sea and river ports within 200 km | Absent | |
Railway (km) | Kotiuzhany railway station in 8 km (South-Western railway) | |
Accessed Railway (km) | absent | |
The nearest airport (км) | Vinnytsia (110 km) | |
The nearest regional center (km) | Vinnytsia (100 km) | |
Infrastructure | Electricity (Yes\No) | Yes |
· electrical voltage (kW) | 100 m | |
· acceptable electric capacity (MW) | 10 and 0,4 kW transformer substation | |
Electricity (Yes\No) | 0,2-0,4 | |
Gas supply (Yes\No) | In process of constructing. Exploitation starts in 2014 | |
- point of connection (distance from the border of the area) (m) | - | |
· calorific rate (MJ/Nm3) | - | |
· diameter of the pipe (mm) | 150 | |
· current capacity (Nм3/hour) | - | |
Water-supply (Yes\No) | Yes | |
- point of connection (distance from the border of the area) (m) | Capping well 300 м | |
· acceptable capacity (m3/day) | 30 | |
Treatment facilities (Yes/No) | No | |
Telephone (Yes\No) | Yes | |
- point of connection (distance from the border of the area) (m) | 500 m. | |
The estimated costs for supplying utilities (to indicate costs for providing necessary communications) | The area is provided with engineer networks, except for gas pipes | |
Current situation (availability of necessary permissions, etc) | Permissions on building and repair works will be acquired during preparation of construction documents | |
Possibilities of the state support | On the basis of public-private partnership or other form | |
Comments
| ||
The offer was prepared | Yakymtsev Mykola – the first deputy of the head of the district state administration, tel. 04mobile 067 Gonchar Ivan – head of the Department of economic of the district state administration, tel. 04, mobile 097 | |
Contact person | Yakymtsev Mykola – the first deputy of the head of the district state administration, tel. 04mobile 067 Gonchar Ivan – head of the Department of economic of the district state administration, tel. 04, mobile 097 |


