(name of investment project, proposal)

_________________________ The Government of the Republic of Tyva________________________

(name of enterprise (organization) - the initiator of project, proposal)

Information about the Enterprise (organization) - the initiator of the project, proposal:

Address:

18, Chuldum Street, Kyzyl, the Republic of Tyva

Telephone:

tel.: 8(394, 3-25-56

Fax:

8(39422)2-16-56

E-mail:

*****@***ru

Leader:

Responsible person - Oyun Buyan Dadyi-oolovich, the deputy minister for economy of the Republic of Tyva

Description of the production:

:

Business-idea, the purpose of the project:

Satisfaction of the increasing consumption of electric power in the republic, the creation of infrastructure for the realization of major investment projects.

A brief description of the region in which the project is intended to be realized:

Kaa-Khem district, the Republic of Tyva (Eastern direction of the republic).

Guarantee of the project with raw materials:

Kaa-Khem deposit (63 mln. of tons of category A+B+C| ), - mine. 95% of supply and resource of the field consist of especially valuable marks Zh-coke (Жкокс) and GZh-coke (ГЖкокс), which are high-quality raw material for the production of metallurgical coke.

Planned production (introduced power):

300 MW of electrical power and 250 gcal/h. - thermal power.

Consumers' market description:

Major investment projects' guarantee (Kyzyl-Kuragino railway building, the mastery of the Kyzyl-Tashtyg polymetallic, Ak-Sug copper-porphyritic deposits, and Elegest and Mezhegey coal­fields), the elimination of energy-scarcity in the Republic.

Readiness degree and project examination:

The Resolution of the Government of the Republic of Tyva ratified the task to make the design of this object. Means for the design are foreseen in the Budget of the Republic of Tyva in 2008. Technical task for the design of object is developed.

Financial estimation of the project:

The total cost of project (mln. of roubles):

14 600

including:

-own investments

-

-the enquired investments

14 600

Forms of investment:

Direct investment, long-term crediting, participation in capital

Expenditures articles:

New building

Normative period of building (project realization):

3 years

Period of the compensability:

4-5 years

Profitability of the project:

20%

Internal rate of profitability (IRR):

13%

Forms of the return of the investments:

Clear profit not less than 1046 mln. roubles per annum

Additional information:

Building of thermo-electric power station for the Republic of Tyva has a fundamental importance and the Government of the Republic will render the investors all possible support to realize the project.


Building of cement plant with a power of 330 thousand of tons per annum with subsequent increase to 1000
_____________________________________ thousand tons._____________________________________

НЕ нашли? Не то? Что вы ищете?

(name of investment project, proposal)

__________________________ The Government of the Republic of Tyva__________________________

(name of enterprise (organization) - the initiator of project, proposal)

Information about the Enterprise (organization) - the initiator of the project, proposal:

Address:

18, Chuldum Street, Kyzyl, the Republic of Tyva

Telephone:

tel.: 8(394, 3-25-56

Fax:

8(39422)2-16-56

E-mail:

*****@***ru

Leader:

Responsible person - Oyun Buyan Dadyi-oolovich, the deputy minister for economy of the Republic of Tyva

Description of the production:

Business-idea, the purpose of the project:

The satisfaction of the growing (what?) in connection with the beginning of the realization of major investment projects, and also priority national projects of demand for the cement in the Republic, the creation of infrastructure for the realization of major investment projects.

A brief description of the region in which the project is intended to be realized:

Ulug-Khem district, the Republic of Tyva (Western direction of the republic).

Guarantee of the project with raw materials:

1. The Karachat clay deposit, situated 17 km South-East of Shagonar (Ulug-Khem district), the reserves of cement clays comprise on the sum of the categories B+Cl, in a quantity of 5836 thousand tons, including on the category В - 2405 thousand tons. 2. The Khaiyrakan limetones deposit, situated 17 km North-East of Shagonar, the reserves of limetones as a carbonate component of cement charge and the raw material for the production of construction lime comprise on the sum of categories A+B+C1 in a quantity of 19223 thousand tons, including on the category A-3851 thousand tons; the category B-4178 thousand tons; С1-11194 thousand tons; also on the category C2-1402 thousand tons. 3. Ulatay iron ores deposit (addition to cement) is situated 220 km from the projected cement plant, reserves of С1-248 thousand tons.

Planned production (introduced power):

330 thousand tons per annum with the subsequent increase to 1000 thousand tons.

Consumers' market description:

Companies-investors, that realize major investment projects, and also organizations, enterprise and private individuals - inhabitants of the Republic of Tyva, Mongolia.

Readiness degree and project examination:

The Resolution of the Government of the Republic of Tyva ratified the task to make the design of this object. Means for the design of the plant are foreseen in the Budget of the Republic of Tyva in 2008.

Financial estimation of the project:

The total cost of project (mln. of roubles):

2 000

including:

-own investments

-

-the enquired investments

2 000

Forms of investment:

Direct investment, participation in capital

Expenditures articles:

New building

Normative period of building (project realization):

2 years

Period of the compensability:

7 years

Profitability of the project:

23%

Internal rate of profitability (IRR):

23%

Forms of the return of the investments:

Clear profit not less than 2 mln. roubles per annum

Additional information:


Aluminum plant building on the base of Bayan-Kol deposit

(name of investment project, proposal)

_______ The Government of the Republic of Tyva

(name of enterprise (organization) - the initiator of project, proposal)

Information about the Enterprise (organization) - the initiator of the project, proposal:

Address:

18, Chuldum Street, Kyzyl, the Republic of Tyva

Telephone:

tel.: 8(394, 3-25-56

Fax:

8(39422)2-16-56

E-mail:

*****@***ru

Leader:

Responsible person - Oyun Buyan Dadyi-oolovich, the deputy minister for economy of the Republic of Tyva

Description of the production:

Business-idea, the purpose of the project:

Complex mastery of Bayan-Kol nephelinic ores deposit.

A brief description of the region in which the project is intended to be realized:

Tere-Khol district of the Republic of Tyva (South-Eastern part of the republic)

Guarantee of the project with raw materials:

Bayan-Kol nephelinic urtrites deposit is characterized by significant reserves, the quality of ores is not inferior to that developed in Kiya-Shaltyr deposit.

The annual output of alumina-58,1 thousand tons, soda ash - about 404,9 thousand tons, potassium fertilizers - 144,9 thousand tons, cement -330 thousand tons.

Planned production (introduced power):

the annual productivity of quarry - 2650 thousand tons of the ore

Consumers' market description:

Companies-investors, that realize major investment projects, and also organizations, enterprise and private individuals - inhabitants of the Republic of Tyva, Mongolia.

Readiness degree and project examination:

Investment proposal. Auction to obtain the right on the development of Bayan-Kol deposit will be held in Tyvanedra in 2008.

Financial estimation of the project:

The total cost of project (mln. of roubles):

27 500

including:

-own investments

-

-the enquired investments

27 500

Forms of investment:

Direct investment, participation in capital

Expenditures articles:

New building, the development of the deposit

Normative period of building (project realization):

4 years

Period of the compensability:

4 years

Profitability of the project:

23%

Internal rate of profitability (IRR):

23%

Forms of the return of the investments:

Clear profit ,9 mln. roubles per annum

Additional information:


The building of chemical plant for the production of extra-pure oxide of silicon, oxide of magnesium, gypsum,
_______ ferrous product from the serpentinite waste of ore mining and processing enterprise «Tuvaasbest».______