(name of investment project, proposal)
Tuvinian Institute of Complex Mastery of Natural Resources of the Russian Academy of Sciences. Siberian Branch
(name of enterprise (organization) - the initiator of project, proposal)
Information about the Enterprise (organization) - the initiator of the project, proposal: | |
Address: | 177 "a", Internatsionalnaya Street, Kyzyl, the republic of Tyva, 667007 |
Telephone: | tel.: 8(39422)2-17-53 |
Fax: | 8(39422)2-17-53 |
E-mail: | *****@***ru |
Leader: | Lebedev Vladimir Ilyich - the director of TICMNR SB RAS. |
Description of the production: | |
Business-idea, the purpose of the project: | Complex processing of the group of enterprises' waste |
A brief description of the region in which the project is intended to be realized: | Barun-Khemchik district of the Republic of Tyva (Western part of the republic) |
Guarantee of the project with raw materials: | Production waste of ore mining and processing enterprise «Tuvaasbest» - 80 mln. m. |
Planned production (introduced power): | Design capacity of the plant: Oxide of silicon (cleanliness 99,99%) -4800kg.; Oxide of magnesium (cleanliness 99,99%) -4800kg.; gypsum - 6048kg.; ferrous product - 2016kg. |
Consumers' market description: | Heat and power plant, the producers of modern semiconductor materials for the computer technology |
Readiness degree and project examination: | The Business-plan, developed by Тувинским институтом комплексного освоения природных ресурсов СО РАН. Today the project on obtaining of the industrial standard of extra-pure silicon from the serpentinite waste of ore mining and processing enterprise is being realized. |
Financial estimation of the project: | |
The total cost of project (mln. of roubles): | 750 mln. roubles. |
including: | |
-own investments | - |
-the enquired investments | 750 mln. roubles. |
Forms of investment: | Direct investment, participation in capital, long-term crediting |
Expenditures articles: | New building. |
Normative period of building (project realization): | 5 years |
Period of the compensability: | 3 years |
Profitability of the project: | 55,5 % |
Internal rate of profitability (IRR): | 61,43% |
Forms of the return of the investments: | Clear profit not less than 6,7 mln. roubles. |
Additional information: |
Organization of the wood processing enterprise of complete technological cycle in Kyzyl
(name of investment project, proposal)
___________________ The Government of the Republic of Tyva__________________
(name of enterprise (organization) - the initiator of project, proposal)
Information about the Enterprise (organization) - the initiator of the project, proposal: | |
Address: | 11, Kalinina Street, Kyzyl, 667009 |
Telephone: | tel.(394 |
Fax: | 8(39422)5-15-57 |
E-mail: | *****@***ru |
Leader: | Responsible person - Sagan-ool Karim Bailak-oolovich, acting as the minister of industry and power engineering of the Republic of Tyva |
Description of the production: | |
Business-idea, the purpose of the project: | Creation of timber complex in Kyzyl of complete closed cycle of production, from obtaining of raw material to the output of glued product and profile moulded articles. |
A brief description of the region in which the project is intended to be realized: | Kyzyl, the Republic of Tyva (the capital) |
Guarantee of the project with raw materials: | It is intended to supply wood from two forest resource bases: the base "Shivey" in Kaa-Khem district and the base in the natural boundary Irtysh in Tes-Khem district. Calculated annual cutting area on fellings of main use is 2,2 mln. cubic meters, including the coniferous economy -1,9 mln. cubic meters. |
Planned production (introduced power): | The volume of output of lumber - 45 thousand cubic meters per annum. |
Consumers' market description: | It is oriented predominantly for the domestic market. |
Readiness degree and project examination: | Investment proposal (idea); there are no technical and economic assessment, design estimates. |
Financial estimation of the project: | |
The total cost of project (mln. of roubles): | 340 mln. roubles. |
including: | |
-own investments | - |
-the enquired investments | 340 mln. roubles. |
Forms of investment: | Direct investment, participation in capital |
Expenditures articles: | New building |
Normative period of building (project realization): | 2 years |
Period of the compensability: | 5 years |
Profitability of the project: | 24% |
Internal rate of profitability (IRR): | 37,54% |
Forms of the return of the investments: | Clear profit - 65,1 mln. roubles per annum |
Additional information: | Tax revenues will be about 49,0 mln. roubles. Number of personnel -121 people. The expected portion of new enterprise in the carrying out of production of timber complex will be 60%. |
Building of the waterpower station with the power of 1500 MW., power transmission line from waterpower
________________________________________ station________________________________________
(name of investment project, proposal)
__________________________ The Government of the Republic of Tyva__________________________
(name of enterprise (organization) - the initiator of project, proposal)
Information about the Enterprise (organization) - the initiator of the project, proposal: | |
Address: | 18, Chuldum Street, Kyzyl, the Republic of Tyva |
Telephone: | tel.: 8(394, 3-25-56 |
Fax: | 8(39422)2-16-56 |
E-mail: | mineconom(a)***** |
Leader: | Responsible person - Oyun Buyan Dadyi-oolovich, the deputy minister for economy of the Republic of Tyva |
Description of the production: | |
Business-idea, the purpose of the project: | Guarantee of realization of the "Aluminum plant building on the base of Bayan-Kol deposit" project, the satisfaction of the increasing consumption of electric power in the republic, the creation of infrastructure for the realization of major investment projects. |
A brief description of the region in which the project is intended to be realized: | Todzha district, the Republic of Tyva (North-Eastern direction of the republic). |
Guarantee of the project with raw materials: | The Yenisey |
Planned production (introduced power): | 1500 M W of the electrical energy |
Consumers' market description: | Aluminum plant on the base of Bayan-Kol deposit, companies-investors that realize major investment projects (Kyzyl-Kuragino railway building, the mastery of the Kyzyl-Tashtyg polymetallic, Ak-Sug copper-porphyritic deposits, and Elegest and Mezhegey coal-fields). |
Readiness degree and project examination: | Investment proposal (idea); there are no technical and economic assessment, design estimates. |
Financial estimation of the project: | |
The total cost of project (mln. of roubles): | 75 000 (additionalmln. roubles for power transmission line) |
including: | |
-own investments | - |
-the enquired investments | 75 000 (additionalmln. roubles for power transmission line) |
Forms of investment: | Direct investment |
Expenditures articles: | New building |
Normative period of building (project realization): | 5 years (power transmission line from the waterpower station - 3 years) |
Period of the compensability: | 12 years |
Profitability of the project: | 18% |
Internal rate of profitability (IRR): | 18,6% |
Forms of the return of the investments: | Clear profit about 4,5 mln. roubles per annum |
Additional information: | Index of profitability - 1,03 Clear given income NPV -mln. roubles |
|