Партнерка на США и Канаду по недвижимости, выплаты в крипто
- 30% recurring commission
- Выплаты в USDT
- Вывод каждую неделю
- Комиссия до 5 лет за каждого referral
Exhibitor Passes are allotted as follows: 1 pass per 3 sq. m of the rented stand space. Exhibitor Passes are valid throughout the build-up, open and breakdown periods of the exhibition.
To speed up the procedure of getting passes, please fill in the form (http://www. *****/common/img/uploaded/divisions/exposervice/BlankSpiska. xls) showing the list of staff who will be working on the stand during the exhibition and email it to *****@***ru not later than 10 April 2010.
Exhibitor Passes are issued by Servicexpo on presentation of Power of Attorney (D.01) and the Application for Exhibitor Passes (D.02).
Company’s CEO:
_____________________ / ___________________ ___ ________________ 20__
(full name.) (signature) (date)
stamp
D.03
DELIVERY/REMOVAL PERMIT APPLICATION/
CONSIGNMENT NOTE
Exhibition equipment, exhibits, stand materials and structures
To be submitted on the Exhibitor’s letterhead in duplicate.
The name of the paying company under the Participation Contract shall be shown.
Expocentre, ZAO To the Inlegmash’2010Exhibition Management Department |
Herewith we apply for a permit to deliver/remove the following exhibition equipment and materials to be showcased or used on stand No. _______ in Pavilion No. ____ during the Inlegmash’2010 International Exhibition.
No. | Item | Quantity |
1 | ||
* Add rows if necessary.
We guaranty timely removal of equipment, exhibits, bulky packaging and stand structures from the venue.
Company’s CEO _______________________/ ___________________
(signature) (full name)
Stamp
IMPORTANT: If in addition to exhibits the vehicle delivers structural elements of the stand (wall panels, carpet, decorative structures and elements etc.), the delivery shall be authorized by Expoconsta ZAO and Fire Station No. 160.
Delivery of LCDs and plasma screen displays, powerful projection and sound equipment and concert lighting equipment shall be authorized by the Telecommunications Division.
Stamp of Expoconsta ZAO | Stamp of Fire Station No. 160 | Stamp of Telecommunications Division. |
D.04
APLICATION FOR WORK PASSES
(For Stand-Building Contractor’s Staff)
to be submitted in triplicate on the company’s letterhead)
Expocentre ZAO
To the Inlegmash’2010
Exhibition Management Department
Herewith we ask you to issue ______ (quantity) work passes to Expocentre Fairgrounds for the staff of the contractor building the exhibition stand for ________________________________ (the Exhibitor’s name), participating in the Inlegmash’2010 International Exhibition. The stand is located in Pavilion No. ___, Hall No. ___, Stand No. ____. The rented stand space is ________ sq. m.
Staff List (showing passport details, places of residence; for persons residing outside Moscow a copy of registration in Moscow shall be included)
No. | Full Name | Passport details | Briefed on health and fire safety and electrical installation work | |
Date | Signature | |||
1 | 2 | 3 | 4 | 5 |
Competent persons on the stand:
1. Person responsible for heath safety –
_______________________ _______________________ _______________ _______________
Job Title Full Name telephone signature
2. Person responsible for fire safety –
_______________________ _______________________ _______________ _______________
Job Title Full Name telephone signature
3. Person in charge of electrical installation work -
_______________________ _______________________ _______________ _______________
Job Title Full Name telephone signature
Company’s CEO:
_______________ _______________ ____ _________________ 20___
Full Name Telephone
IMPORTANT:
The Passes are issued by Servicexpo from 17 April 2010.
To obtain passes, the following arrangements should be made:
1. The Exhibitor’s representative shall be issued with Power of Attorney authorizing that person to receive work passes for the contractor’s staff.
2. This application shall be endoresed by:
- Fire Station No. 160 of the Federal Fire Service:
______________________ _____________________ __________________ _______________
Job Title Full Name signature stamp
- Expoconsta ZAO:
______________________ _____________________ __________________ _______________
Job Title Full Name signature stamp
- Exhibition Management Department:
______________________ _____________________ __________________ _______________
Job Title Full Name signature stamp
To speed up the procedure of getting passes, please fill in the form (http://www. *****/common/img/uploaded/divisions/exposervice/BlankSpiska. xls) showing the list of staff who will be working on the stand during the exhibition and involved in the construction-dismantling works and email it to *****@***ru not later than 10 April 2010.
Exhibitor Passes are issued by Servicexpo on presentation of Power of Attorney (D.01) and the Application for Work Passes (D.04).
| |||
|
EXHIBITION | INLEGMASH’2010 |
Exhibitor | PAVILION | HALL | STAND | ||
CONTACT PERSON
| |||||
Service code | Service Description | Rate (RUB, excl. VAT) | QuantitY | to be rendered by (Date of execution) | Total Amount (RUB) |
В1.1 | Power source for exhibits and non-standard lighting, per connection with fixed capacity | - | |||
up to 10 kW | 6,000 | ||||
up to 20 kW | 11,000 | ||||
up to 30 kW | 14,500 | ||||
up to 50 kW | 20,000 | ||||
up to 75 kW | 25,000 | ||||
up to 100 kW | 35,000 | ||||
В1.2 | Water supply | ||||
Connection of the exhibitor’s kitchen and other equipment on the lower floor to the plumbing system of the pavilion, per connection | 9,500 | ||||
Connection of the exhibitor’s kitchen and other equipment on the upper floor (double deck stands) to the plumbing system, per connection | 10,500 | ||||
В1.3 | Compressed air | ||||
Connection to the air mains with required air consumption up to 30 m3 per hour, per connection | 9,500 | ||||
Connection to the air mains with required air consumption over 30 m3 per hour, per connection | 13,500 | ||||
В1.4 | Telecommunications | ||||
Installation of a telephone | 2,450 | ||||
Installation of a fax machine | 3,150 | ||||
В1.4.2 | Internet access | ||||
Unlimited access to the INTERNET | - | ||||
speed up to 64 Kbps | 3,500 | ||||
128 Kbps | 6,200 | ||||
256 Kbps | 11,100 | ||||
В2.4 | Passes to Expocentre Fairgrounds | ||||
Additional exhibitor pass, each | 880 | ||||
Passes for distributors of promotional materials, per one pass | 5,250 | ||||
Parking pass for construction/dismantling periods, each | 2,650 | ||||
Parking pass for exhibition period to parking lots No. 1, 2, 3 | 7,000 | ||||
Parking pass for exhibition period to parking lot No. 4 | 5,250 | ||||
Blank invitation forms, each | 175 | ||||
В2.1 | Waste removal and stand cleaning | ||||
One time cleaning: | - | ||||
Lower floor, per one sq. m | 17.5 | ||||
Upper floor of a double deck stand, per one sq m | 26.5 | ||||
Daily cleaning of a stand during the exhibition: | |||||
per one sq m of the lower floor | 60 | ||||
per one sq m of the upper floor of a double deck stand | 90 | ||||
Janitorial service, per one sq m per day | 5 | ||||
Cleaning of display cases (glass surface only) | 52.5 | ||||
For And On Behalf of Expocentre ZAO for and on behalf of the Exhibitor | |||||
В2.2 | Security | ||||
Security guard for one stand (indoors) during the build-up, open and breakdown of the exhibition from 800 to 2000, , per hour | 250 | ||||
Security guard for one stand (outdoors) during the build-up, open and breakdown of the exhibition from 800 to 2000, , per hour | 300 | ||||
Security guard for one stand (indoors) during the build-up, open and breakdown of the exhibition, per hour | |||||
from 20:00 to 22:00 | 350 | ||||
from 22:00 to 24:00 | 380 | ||||
from 00:00 to 08:00 | 450 | ||||
SUBTOTAL | |||||
18% VAT | |||||
TOTAL | |||||
Payments for the ordered services shall be made in advance to the account of EXPOCENTRE ZAO by ___ _____________________ 20__Comments regarding ordered services or services which are not listed above (optional):
Issues that are not covered by this Contract shall be dealt with in accordance with the General Terms of Participation in Exhibitions Held at Expocentre Fairgrounds, as approved by Executive Order of the General Director of Expocentre ZAO No. 116 dated 30th November 2004, and considered an integral part of this Contract with all its subsequent amendments. The Exhibitor has read and hereby accepted the General Terms of Participation in Exhibitions Held at Expocentre Fairgrounds with all its supplements including the Rates for Services Provided at Exhibitions Held at Expocentre Fairgrounds, as approved by Executive Order of the General Director of Expocentre ZAO No. 13 dated 14 February 2005 with subsequent amendments. All disputes, differences or claims arising from this Contract or in its connection, including fulfillment, violation, or invalidity, shall be subject to settlement in the Arbitration Court of the Chamber of Commerce and Industry of the Russian Federation in accordance with its Regulations. Decisions of the Court shall be final and binding upon both Parties. The Contract may be signed and other documents exchanged by facsimile transmissions and email with mandatory back up dispatch of the originals of the emailed/faxed copies. Exhibitor undertakes to dispatch the originals of the executed Contract and other executed documents to Expocentre ZAO by registered mail or via a courier service within five days of the signature. ADDRESSES AND BANKING DETAILS OF THE PARTIES | |||||
Expocentre ZAO | Applicant | ||||
Expocentre ZAO | Company Name | ||||
14, Krasnopresnenskaya nab., 123100 Moscow, Russia | Mailing Address | ||||
1А, Sokolnichesky Val., 107113 Moscow, Russia | Legal Address | ||||
/ / | TIN / Entrance Number / BIC | ||||
AKB Peresvet (ZAO), Moscow | Bank Name | ||||
Corr/Account | |||||
Account | |||||
+7 (4/ *****@***ru | Telephone / fax / email | ||||
Authorized Representative acting for and on behalf of Expocentre ZAO | Authorized Representative acting for and on behalf of | ||||
Full Name | |||||
Job Title | |||||
Signature | |||||
Acting Under | Acting Under | ||||
Stamp | Stamp | ||||
Enclosure
Exhibits and works requiring authorization from:
1. Fire Station No.160
1.1. Radioactive, flammable and explosive items and materials
1.2. Exhibits and technology associated with fire risk: naked flames, welding, gas and plasma cutting, soldering
1.3. Fuels and lubricants, inflammable and volatile liquids, solvents
1.4. Containers and tanks with flammable and high-pressure gases
1.5. Structures and materials used in stand construction
2. Capital Construction Department
2.1. Exhibits with a weight exceeding 5 tonnes
2.2. Floor loadings exceeding 2.5 tonnes per 1 sq. m
2.3. Large exhibits exceeding the height and width of the Pavilion entrance gate.
3. Exhibition Management Team
3.1. Chemically, biologically and ecologically dangerous substances
3.2. Production technology and equipment potentially dangerous for health and life of exhibitors and visitors
3.3. Suspension points for exhibits and advertising.
4. Telecommunication Division
4.1. Radio electronic and high-frequency devices
4.2. LCDs and plasma screen displays, high-powered projection and sound equipment, lighting equipment
5. Expoconsta ZAO
5.1. Stand structures (wall panels, carpeting, stand accessories and decorative items etc.)
5.2. Stand layout, number of storeys, construction materials and structures, electrical, plumbing and rigging works, etc.
5.3. Suspended items.
|
Из за большого объема этот материал размещен на нескольких страницах:
1 2 3 |


